• Home Page
  • About Us
  • Awards & Community
  • Employment
  • Contact Us
  • Click for the BBB Business Review of this Contractors - General in Fallon NV
Spacer to balance BROWZ logo at far right Spacer to push BROWZ logo further to the right
    Supplier Management

Utilities



KGID Water Main


A&K Earth Movers, Inc. has been awarded the contract with the Kingsbury General Improvement District to replace a water main and street reconstruction. The 2,650 linear feet of 8 inch waterline is on Beverly Road and Virginia Drive located near the Kingsbury Summit at an elevation of 7,300 feet. There are 7 domestic water services and 5 new fire hydrants on this mountainous section of roadway. Some of these waterlines required difficult rock excavation and rock splitting to complete. Once all the water line is tested, completed and put into service, the existing roadway will be pulverized and repaved with 1,300 tons of asphalt. The expected completion is late July 2014.


Reno Sewer Rehabilitation


This difficult project encompasses more than 19,000 lineal feet of gravity sewer replacement and street rehabilitation on some of the busiest streets in Reno, Nevada. A&K brought to bare 4 mainline pipe crews, 3 pipe lateral crews, grading, paving and miscellaneous crews in order to tackle this challenging project. This project started in March 2013 and will finish in September of 2013.


TCA Properties, LLC - Phase 1


A&K Earth Movers, Inc. has been awarded the TCA Properties, Phase 1 project in the vicinity of Robb Drive, Reno, Nevada. The project consists of the installation of 700 lineal feet of 72 inch RCP storm drain pipe together with 2 manholes, and inlet and outlet structures. The RCP pipe is an extension of the existing NDOT storm drain that runs underneath I-80. The challenging part of the project is the access to the construction site. The pipe needs to be installed in the existing drainage ditch which is located in a ravine approximately 100 feet deep.


Carson City North Roop Street Enhancement


A&K Earth Movers, Inc. entered into a contract with Carson City Public Works to construct the Carson City North Roop Street Enhancement project. The project consists of 3,560 LF of trenching and the installation of 4 inch high density polyethylene fiber optic conduit and 9 traffic rated pull boxes. The storm drain and erosion control impacts will be improved by installing 600 LF of 18 inch pipe complete with catch basins and manholes, and 3200 LF of new curb gutter, sidewalk with valley gutters and spandrels. The project will be finished off with the milling of 16,350 SF of existing asphalt which will be repaved with 2 inch overlay of new asphalt. The entire roadway will then be slurry sealed and new traffic striping and signage installed. When completed this project is to improve the pedestrian safety in this area and reduce a major erosion problem due to lack of curb and gutter and underground storm drain system.


Nevada Pacific Parkway Project


The Nevada Pacific Parkway project consists of the construction of a new connector roadway from the existing Newlands Business Park to the new I-80 Interchange in Fernley, Nevada. The work consists of 41,000 cubic yards of on-site cut to fill earthwork, a sewer system with over 3,000 lineal feet of sewer main of various sizes and manholes and a storm drain system with over 3,100 lineal feet of storm drain pipe complete with catch basins and drop inlets. The water system consists of a total of 5,850 lineal feet of 14" reclaimed water line and 18" domestic water line complete with appurtenances. The primary electrical system required relocation of existing mains, vaults and the installation of new street lighting. The new roadway will be completed with new curb, gutter and sidewalk for the entire length and new asphalt paving that ties in both ends of the project.
© 2010-2012 A & K Earth Movers, Inc.      515 Windmill Dr. Fallon NV 89406      (775) 423-6085