Paving

Air Sailing Inc. Gliderport Runway Rehab


Settled about 20 miles north of Spanish Springs off Winnemucca Ranch Rd, the Air Sailing Gliderport is an airport home to many recreational pilots flying both small engined and air sail glider planes. The Gliderport, consists of two dirt runways, 2 asphalt paved runways along with two hangers and camping facilities. A&K was contracted to pulverize and repave the 1600 linear foot asphalt runway, re-grade the two dirt runways and also to pave aprons for the fueling station and tow plane hangar. A&K partnered with the non-profit owner to maximize their limited budget and to bring as much value as possible to the project. In one example of partnering, A&K crews encountered approx. 5000 square feet of wet subgrade materials during prep of the base grade materials for paving. Instead of a very expensive over-excavation and import operation, A&K was able to adjust their phasing and process the subgrade material to dry it out, therefore minimizing the cost impact to the owner. Even with this setback in time, A&K was able to work on other phases and is still going to finish the project ahead of schedule and weeks ahead of the Gliderport’s first big event of the year.

New River Parkway Extension


A&K Earth Movers, Inc. was awarded the New River Parkway Extension project by the City of Fallon. The scope of work includes earthwork and grade preparation, aggregate base, concrete curb, gutter and sidewalk and asphalt and concrete paving. The scope also includes the installation of the sewer line that will connect the Dairy Farmers of America Milk Processing Plant to the future lift station as well as several storm drain infiltrators to capture run off. The work was started on April 25, 2013 and is expected to complete by the end of July 2013.

Minden Tahoe Airport


The Minden Tahoe Airport in Douglas County is the third busiest airport in Nevada. This FAA project involved asphalt grinding, drainage improvements, crack sealing, paving fabric and a 2 inch overlay of Taxiway A. Communication and coordination with the airport was critical to minimize runway closures, disrupt air traffic and ensure safety to everyone on the ground and in the air. This project was successfully completed in September and October 2012.

Taboosi Way, Yerington Nevada


A&K Earth Movers, Inc. has been awarded a contract for the construction of Taboosi Way for the Yerington Paiute Tribal Housing Authority. The project was a street contruction project which consisted of earthwork, aggregate base installation, concrete curb, gutter and sidewalk and 30,000 square feet of asphalt paving. The project also included the installation of an underground storm water infiltrator system. We began construction in mid-June and completed the paving on July 20th, a full 2 weeks ahead of schedule.

NDOT 3413 & 3457


These two Nevada Department of Transportation contracts ran concurrently in the summer of 2011 in a remote stretch of US95 between Reno and Las Vegas. These projects consisted of pavement grinding, cold recycled asphalt pavement, drainage improvements, shouldering material and placement of 170,000 tonas of new asphalt pavement over 44 miles of two lane highway.