Site Work

Carmax Reno, NV


A&K Earth Movers has been contracted for site work on the future site of CARMAX in Reno Nevada. CARMAX is being built on a 10.4 Acre site in South Reno. The site requires 5,300 cubic yards of onsite cut to fill and 16,000 cubic yards of import material from A&K’s Bella Vista pit. The underground utilities include 3,475 linear feet of various size storm drain pipe, twenty catch basins, eleven manholes with an underground detention structure, and four sand/oil separators ranging in size from 750 gallon to 3,000 gallons. The sewer includes 1,100 linear feet of 8 inch line with five 48 inch sewer manholes. The water system includes an 8 inch private fire loop with a backflow preventer, a 10 inch Backflow preventer and three 3 inch domestic water services to the 3 onsite buildings. Once all the trades have completed their work, A&K will furnish and place 320,000 square feet of 6 inch Type 2 aggregate base and place 4,400 Tons of Type 3 Asphalt. The site is scheduled to be turned over to CARMAX late August 2014.

Marine Diesel Plant Expansion Silver Springs, NV


A&K Earth Movers has been contracted to construct the Marine Diesel plant expansion located in Silver Springs, Nevada. The plant is designed to process used oil and antifreeze into new lubricants. The project consists of 10,000 CY of cut to fill earthwork, the majority of which is in the construction of a drainage channel. The drainage channel is then lined with 4,400 tons of Class 300 rip rap. The expansion also includes the addition of wet utilities such as new water services and a septic system. Upon completion of the earthwork and utilities, a new asphalt road and parking lot will be added. The project is scheduled to be substantially complete in February 2014, with the final completion of the paving in the spring when the weather is more favorable.

Sky Vista Bungalows Stead, NV


A&K Earth Movers broke ground on the Sky Vista Bungalows project in Stead, Nevada in September 2013. Phase 1 includes all the mass grading, utilities, site concrete and paving for nearly 200 new condominium units. This 32 acre site work project involves 86,000 cubic yards of earth work, 8,000 tons of rip rap and over 30,000 lineal feet of utilities. The site work and the first 40 units are expected to be completed in spring 2014.

Dairy Farmers Of America Milk Balancing Plant Fallon, NV


In August 2012, Big D Construction from Salt Lake City, Utah went under contract with The Dairy Farmers of America to construct an $85,000,000 Milk Balancing Plant in Fallon, Nevada. A&K Earth Movers was contracted to perform preliminary site work. The total package of work has grown and includes site grading, underground, utilities, dewatering, a deep mechanical lift station, aggregate base, paving and PCCP. This was achieved by working closely with Big D Construction and all trades and partnering to achieve a successful and timely project.

Auto Zone Store #2220 Fallon, NV


Remove existing PCC parking lot, overexcavation of unsuitable materials, aggregate base, construct positive drainage system using Dura Slot Trench drains and replacing entire parking lot with new 4,000 lb PCC, including new striping with ADA spaces.

WalMart Superstore - Lemmon Drive Stead, NV


The WalMart Superstore located on Lemmon Drive in Stead, Nevada was a project which consisted of utility work, aggregate base installation and asphalt paving. The earthwork had been completed as part of a previous mass grading project and the site was left at building pad grade. A&K installed the sewer system which ranged in depth from 21 to 27 deep as well as a storm drain system with pipe up to 48” diameter and all appurtenances. A&K was also responsible for the installation of complete domestic and irrigation water systems. A&K installed the aggregate base under concrete and asphalt and completed the 400,000 sf asphalt paving ahead of the General Contractor’s project schedule.