Completed Projects

Lemmon Valley Water System Improvements
Heppner Waterline Extensions Phase 7


In June, 2010 A&K Earth Movers, Inc. was awarded the Heppner Waterline Extension Project, the waterline is being implemented by Washoe County in anticipation of failing private wells that the residents are currently using.

A&K Earth Movers began work on the project June 14th, 2010 and was under the gun with a very aggressive schedule that was required in order to win the bid. The work on the project consists of installing 9,178 lineal feet of 6”C-900 PVC, 5,969 lineal feet of 8”C-900 PVC, 20 fire hydrants and 95 domestic water services.

Some of the challenges associated with this project are tight working areas, and as always, working in residential neighborhoods keeping access for residents and maintaining safe operations is key.

The job was estimated to install 850 lineal feet of pipe a day, and at current the A&K crews have managed to average 1000 feet per day, the project is on schedule and is tentatively on the calendar to begin paving operations July 19th.

A&K receives 1st Stimulus
Money from State for Highway Job


The American Recovery and Reinvestment Act has given a boost to the State of Nevada and Northern Nevada Contractors. Nevada has received $201 Million dollars with $140 Million being awarded to the Nevada Department of Transportation (NDOT). With this money NDOT has signed contracts for $71 million mostly for construction on our local highways. Out of the stimulus money A and K was awarded the first bid for a nine mile resurfacing project on Inter State 80 in Pershing County.

Fernley Water Conveyance Infrastructure Project 3A

A&K is currently constructing Phase 3A of the new water system developed by the City of Fernley. The project consists of the installation of 7,375lf of 36” ductile iron pipe, 4,695lf of 30” C905 PVC pipe, 12,095lf of 24” C905 PVC pipe and 1,481lf of 20” C905 PVC pipe including all appurtenances for domestic and raw water transmission. The project included a 36” and 42” bore underneath Highway US95A which was completed by Silver State Boring, Inc. After the installation of the water lines, the project was completed with the reconstruction of aggregate and asphalt roads.

Fernley Water Conveyance Infrastructure Project 1B

A&K is completing 3,850 FT of 18” raw water main for the City of Fernley. The new raw water transmission main will be supplying well water to the cities water treatment plant. This project runs between Mesa Drive and Logan Lane and includes 320 FT of 30” dia. steel casing to be jack and bored under Union Pacific Railroad tracks.

NDOT 3368

The Silver Springs Project (NDOT 3368) consists of removing existing culvert pipe and installing a triple reinforced concrete box culvert to help improve drainage to the area during large rainstorms. We will build a detour to divert traffic while we install the new triple box culvert. We have some miscellaneous drainage pipes to extend and then we will be ready to install approximately 29,000 tons of Type 2 asphalt followed by 10,000 tons of open grade asphalt. Upon completion of the asphalt portion, we will finish the shoulder with approximately 18,000 tons of base.

Stewart Street Extension Project

With the widening and extension of North Stewart Street from East Williams Street (US Highway 50) to David Street and some side street roadway improvements. This project included aggregate base, curb and gutter, sidewalk, bituminous pavement, traffic signal modifications, and signing and striping improvements. Also completed was underground utility work including conduit for street lights and signal inter-tie, water mains, sanitary sewer and storm drains.

Truckee Canal Conduits Repairs - TCID

Repairs to the Truckee Carson Irrigation Canal in Fernley, Nevada. Project consisted of 32 individual repairs over a 12 mile segment of the canal levee including 2,000 feet of pipe, 17 concrete takeout structures involving over 600 cubic yards of concrete and 43,000 cubic yards of excavation and backfill on an aggressive and challenging 3 month contract. Project completed in winter/spring 2012.

East/West Transmission Line - Carson City, NV

A&K was awarded a contract for the installation of a new transmission main in Carson City, Nevada. The work included the installation of over 5,500 lineal feet of 24” diameter water line both fusible and bell and spigot pipe. A&K was also required to install 3 conduits in the same trench for the installation of fiber optic cable. A&K hired a subcontractor to complete a 950 lineal foot bore of 36” diameter casing to install the transmission main under US395. Over half of the trenching was through a designated wet land within a construction zone of 50 foot wide, with the work under the jurisdiction of the Army Corp of Engineers. A&K reconstructed the entire length of Butti Road with new curb, gutter and sidewalk, storm drain upgrades, and reconstructed the intersection of Saliman and Roop Streets. The Saliman Street reconstruction required an accelerated schedule so the work would be completed prior to the start of the new school year. The entire project was completed ahead of schedule.
NDOT Maintenance Facility - Sparks, NV

A and K reconstructed approximately 4 acres of heavy duty asphalt parking lot for NDOT's equipment maintenance facility. The project consisted of drainage improvements and installation of a 4,000 gallon storm water treatment system, fueling station reconstruction, concrete driveways and aprons, new aggregate base and asphalt paving.

City of Fallon Multi-Purpose Building - Fallon, NV

The City of Fallon Multi-Purpose Building is a recreational building that is funded jointly with the Churchill County Recreation Department along with federal funding. A&K's scope for this project is to construct the subgrade aggregate base, footings, utility trench and backfill, vapor barrier and 4,000 LB PCC slab. Also included in our scope is the sewer infrastructure and all offsite concrete and paving. The project is scheduled for completion in late summer 2012.
 